intermediate work · Scurry County Towle Park public pool and splash pad, 3000 Towle Park Rd, Snyder, TX 79549 (public county park, confirmed address, park-wide coordinate confirmed)
Find out what the splash pad does with its water, and design the fix if it wastes it, Scurry County Towle Park.
Fund it for $135. Proof lands onchain when it's done.
$135 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesMany splash pads are built once-through, sending every gallon straight to the storm drain after a single pass over a child's feet, and Scurry County Towle Park's own splash pad has never had its water system named in writing, so nobody knows whether it is one of them.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Review the splash pad's own as-built plans, permit records, or equipment-vault signage from outside the vault, without opening any electrical panel or pump enclosure, to determine whether the pad is once-through-to-storm-drain or already recirculating with its own filtration and disinfection loop.
- 2. Document what the pad's water system actually does in plain language, naming it clearly as once-through or recirculating, with a photo of the vault exterior and any visible discharge point.
- 3. If the pad is once-through, draft a scope and proposal for converting it to a recirculating filtration-and-disinfection loop, sized to the pad's own flow rate, referencing standard splash-pad recirculation practice.
- 4. Deliver the finding and, where applicable, the retrofit proposal to the parks or facilities department, naming the follow-on licensed-contractor build.
What counts as done
- Written finding naming the splash pad's water system as once-through or recirculating
- Photo of the equipment vault exterior and any visible discharge point, taken without opening the vault
- For a once-through pad, a delivered scope and proposal for a recirculating retrofit
- Confirmation that no electrical panel, pump enclosure, or chemical container was opened or touched at this rung
Proof is measured against these, not judged by taste.
The standard this serves
Water Efficiency. Water efficiency is the quiet discipline of wasting nothing indoors. The EPA's WaterSense program sets the marks: how many gallons a minute a faucet should pass, how to find the leak that runs a toilet all night, how a household's water bill tells a story. Mastery looks like an auditor who can walk a home in an hour and find every hidden gallon. The skill is built one fixture at a time, which is exactly what this packet asks: measure one flow, find one leak, record one truth about where the water goes.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1786417440659_bd6wygl","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.