intermediate work · 500 Melba St, Longview, TX 75602 (Longview ISD Early Childhood Learning Center site, south Longview, Gregg County -- a public school district bond construction project)
Build a stabilized rock entrance pad so site mud stays off the public road, Longview ISD Early Childhood Learning Center, Longview, TX (public school district bond project).
Fund it for $260. Proof lands onchain when it's done.
$260 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesEvery vehicle that drives off bare site soil onto the public road carries mud with it, mud that the next rain washes into the storm drain and then the creek. A rock pad at the site's vehicle gate, wide and long enough that a tire crosses it fully before reaching pavement, shakes that mud loose before it ever leaves the site.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Confirm the vehicle gate location and the pad's confirmed length and depth with the general contractor's site supervisor.
- 2. After the site delivers and dumps clean angular rock at the gate, hand rake and spread it to the confirmed depth across the full width of the entrance, from the road edge back into the site.
- 3. Confirm the finished pad runs the full confirmed length so a tire crosses it completely before reaching public pavement.
- 4. Photograph the finished, spread pad across its full width and length.
- 5. Check the pad weekly and after heavy equipment traffic, and top up rock by hand where it has been pushed down into the mud.
What counts as done
- Confirmation that the gate location and pad dimensions were confirmed with the general contractor's site supervisor
- Photo of the rock spread across the full width of the entrance
- Confirmation the pad's length was measured against the confirmed spec so a tire crosses it fully
- Before and after photo of any weekly top up
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1786431674846_p3j7r8x","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.