intermediate work · Johnson Street corridor, City of Marshall 2026 Street Improvement Program, Marshall, TX 75670 (Harrison County, a public city street reconstruction project)
Install a properly buried silt fence around the site, the Johnson Street corridor, City of Marshall 2026 Street Improvement Program, Marshall, TX (public street reconstruction project), a 3-role crew job.
Fund it for $420. Proof lands onchain when it's done.
$420 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesBare, disturbed soil at an active construction site moves into the nearest storm drain and then the nearest creek on the first hard rain; sediment is the single largest pollutant by volume from land development. A silt fence only works if its fabric is buried into the ground rather than just staked on the surface, and burying a fence line the right way is genuinely a several person job done at one time along one run, not a solo task. Confirm the perimeter line with the general contractor's site supervisor before any post goes in, then run the crew: one person sets the line and posts, one cuts the buried toe and sets the fabric, one backfills and tamps behind them.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Confirm the fence line with the general contractor's site supervisor before any post is set, and confirm every crew member's site safety induction is current.
- 2. Role 1, Layout and Post Setter: flags the confirmed line and drives support posts or stakes at the correct spacing ahead of the other two roles.
- 3. Role 2, Slot Cutter and Fabric Setter: cuts a narrow slot only a few inches deep by hand with a flat spade or a walk-behind slot cutting tool, never a below grade opening deep enough to stand in, and positions the fabric with its bottom edge down in the open slot.
- 4. Role 3, Backfill and Tamp: backfills the slot firmly over the buried fabric edge immediately behind Role 2, then attaches the fabric to the posts.
- 5. Photograph the buried edge in the open slot before backfill at several points along the run, then photograph the finished, backfilled, tamped and attached fence line after.
What counts as done
- Confirmation that every crew member had a current site safety induction before work began
- Confirmation that the fence line was confirmed with the general contractor's site supervisor before any post was set
- Photo of the fabric's buried edge in the open slot before backfill, at several points along the run
- Photo of the finished, backfilled, tamped and post-attached fence line
- Confirmation that all 3 roles, Layout and Post Setter, Slot Cutter and Fabric Setter, and Backfill and Tamp, were filled by separate people working the same shared run
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1786431713968_od5sgic","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.