Anyone can start here · a gully cutting through the back of a resident's own rural property, Ozona, TX 76943 (Crockett County; best-estimate location, exact address not confirmed)
Reset any rock structure that moved.
Fund it for $80. Proof lands onchain when it's done.
$80 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesA hand built rock structure either seats itself in the first big flow it sees or tells you it was built wrong, and the only way to find out is to go back and look. This rung walks every structure built in this chain, the step-pool at the head, the rundown, the deflector, and the one-rock dam, after the season's first significant flow, and resets anything that shifted, silted in past its design intent, or needs a rock replaced.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Wait until after the season's first significant flow has fully drained, and confirm no rain is forecast for the watershed, before entering the channel.
- 2. Walk the full chain, headcut step-pool, rundown, deflector, and one-rock dam, photographing each structure's current condition against its own original after-photo.
- 3. Hand reset, re-key, or add rock to any structure that shifted, undercut, or silted in beyond its design intent, following the same hand-tools and height limits as the original build.
- 4. Photograph each reset structure and record which of the four needed work this season and which held as built.
What counts as done
- Confirmation that work began only after the season's first significant flow had fully drained and no rain was forecast
- Before photo of each of the four structures showing current condition against its own original after-photo
- Confirmation that any shifted or undercut rock was reset by hand within the same height and tools limits as the original build
- After photo of each reset structure with a note on which structures needed work this season
Proof is measured against these, not judged by taste.
The standard this serves
Watershed Health. A watershed is everything the land pours into a stream, and the stream keeps the record. The EPA's bioassessment method reads that record through the small creatures living in the gravel: mayflies and caddisflies mean clean water, only worms and midges mean trouble. Mastery looks like a person who can wade one riffle with a net and tell you how the whole valley is doing. That skill is built sample by sample. This packet is one of them: one site, one careful count, one entry in the long record of a stream.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1786674291530_vd6ahlv","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.