intermediate work · a gully cutting through the back of a resident's own rural property, Leakey, TX 78873 (Real County; best-estimate location, exact address not confirmed)
Armor the drop.
Fund it for $190. Proof lands onchain when it's done.
$190 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesA second drop, a nick point, sits a short distance below the headcut treated by the rung before this one; left alone, this is the next point in line to become the next headcut. A rock rundown, an armored ramp of hand placed rock laid over the drop, lets water descend across stone the whole way down instead of digging its own new step, so the grade below the head stops advancing too.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Walk to the nick point on stable, dry ground and photograph it before starting, noting its approximate drop height.
- 2. Confirm permission and any permit requirement exactly as described in this rung's safety notes before placing a single rock.
- 3. Hand place overlapping rock in a graded ramp across the drop, largest rock at the toe of the ramp and smaller rock upstream, so water sheets across stone the whole way down rather than plunging over a bare edge.
- 4. Confirm the finished ramp is knee height or lower at its highest point and photograph it from the same before vantage.
What counts as done
- Before photo of the nick point showing its approximate drop height
- Confirmation that the weather and upstream conditions were checked and the channel was dry before work began
- Confirmation that permission and any required permit were confirmed before the first rock was placed
- After photo of the finished rundown ramp from the matching before vantage, with rock grading (large to small, toe to head) recorded
Proof is measured against these, not judged by taste.
The standard this serves
Watershed Health. A watershed is everything the land pours into a stream, and the stream keeps the record. The EPA's bioassessment method reads that record through the small creatures living in the gravel: mayflies and caddisflies mean clean water, only worms and midges mean trouble. Mastery looks like a person who can wade one riffle with a net and tell you how the whole valley is doing. That skill is built sample by sample. This packet is one of them: one site, one careful count, one entry in the long record of a stream.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1786674369688_t3g1ndg","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.