advanced work · a resident's own home, Leakey, TX 78873 (Real County; best-estimate location, exact address not confirmed)
Retrofit the resident's own well-pump motor to high efficiency with a VFD, a resident's own home, Leakey, TX (Real County).
Fund it for $240. Proof lands onchain when it's done.
$240 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesThis resident's own well-pump motor runs constant-speed well below its rated efficiency, burning real electricity against every irrigation and household draw; swapping in a high-efficiency motor with a variable-frequency drive matches output to actual demand and cuts that draw immediately.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Confirm the resident's permission and the pump's current nameplate rating, and photograph the existing motor before work.
- 2. Licensed electrician de-energizes and locks out/tags out the circuit before any motor or panel work; never service an energized panel.
- 3. Install the high-efficiency motor and variable-frequency drive, matching nameplate and drive parameters to the well's rated flow.
- 4. Restore power, commission the drive, and photograph the running pump with a post-retrofit amperage reading.
What counts as done
- Licensed-electrician lockout-tagout record for the motor swap
- Before photo of the old constant-speed motor nameplate
- Confirmation that the new high-efficiency motor and VFD were commissioned to the well's rated flow
- Post-retrofit amperage reading showing the reduced electrical draw at matched output
Proof is measured against these, not judged by taste.
The standard this serves
Energy Efficiency Audit. Energy efficiency work begins with the walkthrough audit, the kind the ASHRAE standard describes: a trained eye moving through a building, reading the bills, the walls, the lights, and the equipment, and coming out with the short list of fixes worth doing first. Mastery looks like an auditor who can feel where a building is bleeding money within the hour, and prove it on paper. That instinct is trained by repetition on real buildings. This packet is one repetition: one system observed, one reading taken, one finding recorded the way the standard asks.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1786674434824_6nabopa","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.