advanced work · the farmworker health clinic in Kanab, UT
Check weatherization readiness.
Fund it for $552. Proof lands onchain when it's done.
$552 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesThe farmworker health clinic in Kanab, UT has never had this checked by anyone here. Do a simple, honest check now.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- camera
- tape measure + flashlight (attic, crawlspace, mechanical rooms, rim joist)
- low-cost CO monitor for spot readings at combustion appliances
- smoke pencil or incense stick for qualitative draft tracing (no blower door)
- tablet/clipboard with the weatherization-readiness checklist and the building's floor plan
- thermal/IR camera (optional, insulation-gap scope)
Steps
- 1. Confirm scope with the facility manager or building engineer and record what the BUILDING actually reports: which zones run cold or hot, which complaints recur, what the utility bills and any prior energy study already say, and which capital-planning cycle this scope has to land in. Ask for the building's own records first, because an institutional building usually has them and a home usually does not.
- 2. Establish the constraints a home does not have, before scoping anything: occupancy hours and which spaces can be taken out of service, whether the building is historic or otherwise protected, whether the roof is under warranty, whether any assembly is fire-rated, and who holds the service contracts on the mechanical systems.
- 3. Inventory the envelope by assembly with photos: attic or roof-deck insulation presence and approximate depth/R-value, accessible wall/floor/rim-joist insulation, window and door condition and weatherstripping, and visible bypasses (top plates, chases, shafts, recessed lights, roof hatches, unsealed penetrations between conditioned and unconditioned space).
- 4. Trace drafts qualitatively at suspect points with the exhaust systems running, and rank the air-sealing targets. Note that quantitative verification belongs to the installing contractor, and that a building of this size is normally verified zone by zone rather than with a single whole-building test.
- 5. Screen combustion safety BEFORE any tightening is planned: photograph each combustion appliance and its venting, take a CO spot reading, and flag anything (orphaned water heater, corroded flue, suspected backdrafting, a boiler room that draws combustion air from a space about to be sealed) that a BPI-qualified professional or the building's mechanical contractor must clear before ANY air-sealing proceeds.
- 6. Check the moisture prerequisites: any active leak, bulk-water entry or damp assembly is sequenced AHEAD of insulation, because insulating a wet assembly buys a bigger problem. Note the ventilation consequence of tightening, and confirm any change against the building's required outdoor-air rate rather than a residential rule of thumb.
- 7. Assemble the readiness package: ranked air-sealing targets, insulation gaps by assembly with rough quantities, combustion-safety flags that gate the work, moisture prerequisites, ventilation-after-tightening notes, and the funding paths an institution can actually use (utility commercial incentive programs, state energy office and school-facility grants, performance contracting) rather than the income-eligible residential programs, which a public building cannot qualify for.
- 8. Enter photos, GPS/address, the assembly inventory, CO readings and the readiness package, and hand it to the facility manager in the form their capital planning uses; sign. The walk scopes work, it never installs.
What counts as done
- Photo inventory of every envelope assembly (attic/wall/floor/rim, windows/doors) with approximate insulation levels
- CO spot readings at each combustion appliance with any tightening-gate flag named
- GPS / address confirm
- Weatherization-readiness package: ranked air-sealing targets, insulation gaps w/ rough quantities, moisture prerequisites, ventilation-after-tightening notes
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787179247559_wv1roar","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.