Anyone can start here · Public corridor, Gratiot Avenue between Conner St and E Outer Dr, Detroit, MI 48213

Map the illegal dumping piles along a Detroit east side corridor.

Fund it for $140. Proof lands onchain when it's done.

$140 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.

What the work involves

Illegal dumping hits Detroit's east side corridors over and over, and crews can't clear what nobody has mapped. A monthly photo survey of every pile (location, size, contents) is the work order the follow-on removal crew runs on.

Where
Public corridor, Gratiot Avenue between Conner St and E Outer Dr, Detroit, MI 48213 · Open the map
Pay
$140 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
Per-pile survey list with GPS-dated photos and city report confirmations

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-18
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. Walk a set corridor route and locate every dumping pile visible from public space.
  2. Record each pile's location, estimated size, and main contents.
  3. Flag piles with drums, tanks, or unknown containers as hazardous, for report only, never touching.
  4. Submit each pile to the city's public reporting channel.
  5. Photograph every pile with GPS and date on and record the full survey list for the removal crew.

What counts as done

  • Survey list of every pile with location and contents
  • GPS-and-date-stamped photo of each pile
  • Screenshot of at least three city reports submitted
  • Hazard flags noted for anything suspicious

Proof is measured against these, not judged by taste.

The standard this serves

Community Needs Intake. Community needs intake is the front door of ecological work, run like a good 311 desk: a neighbor names a specific problem in a specific place, an eroding slope, a flooded corner, a bare lot, and it is documented with a photo, a location, and a plain account of who is affected, then mapped to the global goal it belongs to. Mastery looks like intake so clear that a stranger could fund the fix from the write-up alone. This packet is one need, seen and recorded properly. Nothing gets repaired that was never named.

The money and the proof

What is promised, and what is not.

Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787180576202_wkiieo5","funderWallet":"0xYOU"}.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.