intermediate work · Orilla publica del lago de Salto Grande, Concordia, AR
Hacer la ronda de observacion del agua en la orilla publica del lago | Run the water-observation round on the lake's public shore.
Fund it for $260. Proof lands onchain when it's done.
$260 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesEl lago es la fuente de agua y de recreacion de la region y su orilla publica no tiene una serie propia de parametros de campo. Esta ronda la construye desde la orilla, con procedimiento fijo. | English: The lake is the region's water source and its place of recreation, and its public shore has no field-parameter series of its own. This round builds one from the bank, to a fixed procedure.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Fijar los puntos de la ronda sobre la orilla publica y registrarlos con GPS. | Fix the round's points on the public shore and record them with GPS.
- 2. Calibrar el instrumento antes de salir y anotar la calibracion. | Calibrate the instrument before setting out and log the calibration.
- 3. Tomar en cada punto, desde la orilla, temperatura, pH, conductividad y turbidez, siempre en el mismo orden. | At each point, from the bank, take temperature, pH, conductivity and turbidity, always in the same order.
- 4. Fotografiar el punto y la lectura del instrumento al tomarla. | Photograph the point and the instrument reading as it is taken.
- 5. Cargar la planilla con fecha, hora y clima, y archivarla junto a la serie previa. | Fill the sheet with date, time and weather, and file it alongside the previous series.
What counts as done
- Coordenadas GPS de cada punto de la ronda | GPS coordinates of each point on the round
- Registro de calibracion del instrumento antes de la ronda | Instrument calibration record from before the round
- Foto de la lectura de cada parametro en cada punto | Photo of each parameter's reading at each point
- Planilla con fecha, hora y clima archivada junto a la serie previa | Sheet with date, time and weather filed alongside the previous series
Proof is measured against these, not judged by taste.
The standard this serves
SDG 6, Clean Water. Goal 6 promises what every person needs first: safe water to drink and a clean way for it to leave. In a city that promise lives or dies in small green places: the rain garden that swallows a storm, the swale that filters a parking lot, the drain kept clear of leaves before the rain arrives. Mastery looks like a street that no longer floods and a creek that runs clear an hour after the storm. It is built by hand at exactly this scale: dig one basin, plant one garden, clear one drain, and write down what you did.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787183535204_t6l4gl6","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.