intermediate work · Jesse Owens Park, 9835 S Western Ave, Los Angeles, CA 90047
Resurface and clear the perimeter walking-path, segment 2 -- Jesse Owens Park, 9835 S Western Ave, Los Angeles, CA 90047.
Fund it for $480. Proof lands onchain when it's done.
$480 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesThis park's perimeter walking path has eroded gravel, root-heaved gaps and overgrown edges narrowing the path where walkers, joggers and wheelchair users all share the same lane. Every segment really does need this -- regrade and clear it one stretch at a time.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- the land manager's work authorization and the trail's design tread width
- hand tools: McLeod or rake, pulaski or mattock, loppers, shovel
- erosion-control matting, staples, and locally specified surfacing or step material
- clinometer or level for outslope and grade
- gloves, eye protection and sturdy footwear
- camera + GPS phone
Steps
- 1. Photograph the trail segment as found and record what is failing (rutting, a blocked drain, a widened tread, an eroding step or fall line).
- 2. Confirm the land manager's authorization for this segment and confirm no habitat or seasonal closure applies today.
- 3. Restore drainage first: clear the existing grade dips and drain outlets so water leaves the tread, because tread repair without drainage fails in one storm.
- 4. Repair the tread to the design width and to a 3 to 5 percent outslope, filling ruts with compacted mineral soil rather than loose duff.
- 5. Set matting, check steps or armoring by hand where the grade needs it, staking to the spec and keying the edges into the tread.
- 6. VERIFY: measure the finished outslope and tread width, and water-test one drain outlet to show water leaves the trail rather than running down it.
- 7. Photograph the finished segment from the before vantage, log the segment length worked, and enter both in the proof record.
What counts as done
- Before photo of the eroded/narrowed path segment
- After photo showing regraded aggregate surface at full required width
- Vegetation-clearance log (overhanging branches, encroaching shrubs cut back to the path edge)
- Drainage confirmed clear at any cross-culvert or low point along the segment
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787183997513_qr2snn3","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.