Anyone can start here · Binjiang Forest Park public grounds, Pudong New Area, Shanghai, CN
在公共进出点按固定样带计数漂浮垃圾类别:上海市浦东新区滨江森林公园 | Count the shoreline litter by category along a fixed transect.
Fund it for $130. Proof lands onchain when it's done.
$130 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involves清一次垃圾知道有多少,量一条固定样带才知道趋势。同一条一百米样带每月走一次、按同样的类别计数,一年下来就能看出哪种垃圾在增加、哪次清理真的起了作用。这一项只计数,不清捡。现场:上海市浦东新区滨江森林公园。长江口与黄浦江交汇处的林地公园,公共岸线是漂浮垃圾的汇集处。 | English: A clean-up tells you how much there was; a fixed transect tells you the trend. Walking the same hundred-metre line every month and counting the same categories shows, within a year, which litter is rising and which clean-up actually held. This rung counts only, it does not collect. Site: Binjiang Forest Park, Pudong New Area, Shanghai. A woodland park where the Huangpu meets the Yangtze estuary, whose public shore collects floating litter.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. 在进出点布设一条一百米固定样带,两端记录GPS点位并做永久标记。 | Set a fixed hundred-metre transect at the access point, with a GPS pin and permanent marker at each end.
- 2. 沿样带以两米宽度逐段行走,按塑料瓶、塑料袋与薄膜、泡沫、渔具与绳索、其他五类计数。 | Walk the transect in a two-metre band and count in five categories: plastic bottles, bags and film, foam, fishing gear and rope, and other.
- 3. 记录当日水位、上次降雨日期和最近一次清捡日期。 | Record the day's water level, the date of the last rain and the date of the last clean-up.
- 4. 每段拍一张定点照片,构图与上一次保持一致。 | Take one fixed-frame photograph per segment, matching the previous round's composition.
- 5. 把计数表、水位与照片交给管养单位,本项不清捡任何物品。 | Hand the count sheet, the water level and the photographs to the maintenance unit; this rung collects nothing.
What counts as done
- 样带两端GPS点位与永久标记照片 | GPS pins and photos of the permanent markers at each transect end
- 五类计数表 | The five-category count sheet
- 当日水位、上次降雨与上次清捡日期 | The day's water level and the dates of the last rain and the last clean-up
- 各段定点照片 | The fixed-frame photograph for each segment
Proof is measured against these, not judged by taste.
The standard this serves
Watershed Health. A watershed is everything the land pours into a stream, and the stream keeps the record. The EPA's bioassessment method reads that record through the small creatures living in the gravel: mayflies and caddisflies mean clean water, only worms and midges mean trouble. Mastery looks like a person who can wade one riffle with a net and tell you how the whole valley is doing. That skill is built sample by sample. This packet is one of them: one site, one careful count, one entry in the long record of a stream.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787184255939_2i5ef6p","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.