advanced work · Throop2016
Replace the gas furnace with a heat pump.
Fund it for $880. Proof lands onchain when it's done.
$880 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesThe gas furnace at a brick two-flat on the 2000 block of S Throop St, Pilsen, Chicago, IL 60608 burns fossil fuel for every hour of Chicago winter heat; a cold-climate heat pump sized to the readiness survey is the Energy-petal repair, and it cools too.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- Manual J/S load calculation + approved permit
- heat-pump equipment (outdoor + indoor units), line set, pad/brackets, condensate handling
- refrigerant gauges/scale + vacuum pump + torque tools (EPA 608-certified technician)
- multimeter + thermometer/anemometer for commissioning airflow and delta-T
Steps
- 1. ASSESS: verify the Manual J/S sizing against the home (envelope, ductwork or head locations), confirm electrical capacity for the new circuit, and photograph the existing system and nameplates.
- 2. Decommission and recover refrigerant from the old system per EPA 608; remove equipment for lawful disposal/recycling and document it.
- 3. Set and mount the new equipment, run and braze/flare the line set, pull vacuum to spec, and release/weigh in charge per manufacturer; a licensed electrician lands the new circuit and disconnect.
- 4. Commission: verify airflow, refrigerant charge (subcooling/superheat per spec), heating and cooling delta-T, and condensate drainage; set up controls/thermostat.
- 5. VERIFY: pass the mechanical/electrical inspection; record commissioning numbers and before/after photos; leave the owner the manual, warranty registration, and maintenance schedule.
What counts as done
- Before photos incl. old-equipment nameplates + refrigerant-recovery record
- Commissioning sheet (vacuum, charge method, delta-T, airflow) confirming cold-climate performance
- Permit inspection pass reference
- After photos of the installed system and disconnect labeling
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787185832930_877lmwc","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.