Restore worn-thin impact surfacing under the play equipment, zone 2 -- the municipal park playground, Guymon, OK 73942.

Fund it for $260. Proof lands onchain when it's done.

$260 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.

What the work involves

The impact-absorbing surfacing under this play structure has worn down far below the ASTM F1292/CPSC critical-height depth in the highest-traffic fall zones, leaving kids landing on compacted, thin material instead of a safe cushioned surface.

Where
the municipal park playground, Guymon, OK 73942 · Open the map
Pay
$260 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
before/after depth photos at 3+ fall-zone points + material-type record + raking/leveling confirm + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-19
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

A documented method, so this packet comes out the same whoever does it.

Bring

  • the surfacing material specified for this playground (engineered wood fiber, loose fill or the poured-in-place patch kit)
  • depth probe or a marked measuring rod + tape measure
  • rake, shovel, wheelbarrow and a screed board
  • the equipment's posted fall height and the surfacing manufacturer's depth table
  • site closure signage and barrier tape
  • gloves and eye protection
  • camera + GPS phone

Steps

  1. 1. ASSESS: photograph the use zone as found and probe the surfacing depth at the fall-critical points (under swings, at slide exits, beneath climbers), recording every reading.
  2. 2. Close the use zone with signage and barrier tape before any material is moved; a partially filled use zone is more dangerous than a worn one.
  3. 3. Remove contamination and compacted material from the repair area, and check the sub-base drains rather than holding water.
  4. 4. Place the specified surfacing to the depth the manufacturer's table gives for this equipment's posted fall height, raking level across the whole use zone rather than only the worn patch.
  5. 5. VERIFY: re-probe the same fall-critical points and record the depths; confirm each meets or exceeds the table value for the posted fall height.
  6. 6. Confirm the use-zone extent still meets the CPSC handbook clearance around the equipment, then reopen and photograph from the before vantage; enter depths and photos in the proof record.

What counts as done

  • Before photos with a ruler showing existing surfacing depth at 3+ fall-zone points
  • Material-type record (matched to the existing certified surfacing product)
  • After photos with a ruler showing the topped-up, raked-level depth at the same 3+ points
  • Confirmation the surfacing meets the critical-height depth for the tallest piece of equipment in the zone

Proof is measured against these, not judged by taste.

The money and the proof

What is promised, and what is not.

Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787191861197_f3se94h","funderWallet":"0xYOU"}.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.