intermediate work · Public corridor, Harper Avenue between Chalmers St and Cadieux Rd, Detroit, MI 48213
Clear the mapped dumping piles from a Detroit east side corridor.
Fund it for $340. Proof lands onchain when it's done.
$340 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesOnce dumping piles are mapped, someone still has to move them, and every week a pile stands, it grows. This packet clears the surveyed, non-hazardous piles from the corridor and stages them for legal bulk pickup, closing the loop the survey opened.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Start from the current dumping survey list for the corridor and plan the pickup staging points.
- Clear each non-hazardous pile: bag loose material, stack bulk items, and separate tires.
- Stage everything at the legal bulk collection point per city rules.
- Skip and photograph any pile with drums, tanks, or unknown containers for the credentialed crew.
- Photograph each cleared site before and after with GPS and date on and record the load counts.
What counts as done
- Before/after photo pairs for each cleared pile with GPS and date
- Photo of staged material at the legal collection point
- Load count record (bags, bulk items, tires)
- Photo report of any hazardous pile left for the credentialed crew
Proof is measured against these, not judged by taste.
The standard this serves
Community Needs Intake. Community needs intake is the front door of ecological work, run like a good 311 desk: a neighbor names a specific problem in a specific place, an eroding slope, a flooded corner, a bare lot, and it is documented with a photo, a location, and a plain account of who is affected, then mapped to the global goal it belongs to. Mastery looks like intake so clear that a stranger could fund the fix from the write-up alone. This packet is one need, seen and recorded properly. Nothing gets repaired that was never named.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787192148568_yemy3vc","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.