advanced work · Griffith Observatory, 2800 E Observatory Rd, Los Angeles, CA 90027

Electrical panel capacity upgrade to enable electrification, Griffith Observatory.

Fund it for $300. Proof lands onchain when it's done.

$300 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.

What the work involves

Griffith Observatory's electrical panel is at or near its rated capacity, which blocks any further electrification (heat pump, EV charging, induction kitchen) until it is upgraded. A licensed electrician upgrades the panel to code and re-labels every circuit.

Where
Griffith Observatory, 2800 E Observatory Rd, Los Angeles, CA 90027 · Open the map
Pay
$300 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
Photo of the old panel nameplate before work + Signed permit / AHJ inspection record + Photo of the new panel with every breaker labeled + Circuit-by-circuit test log

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-10-04
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. 1. Photograph the existing panel nameplate and every circuit breaker label as found.
  2. 2. Pull the permit and de-energize the service per utility/AHJ lockout procedure.
  3. 3. Install the upgraded panel and reconnect each circuit, verifying polarity and torque to spec on every lug.
  4. 4. Re-energize and test every circuit for correct operation.
  5. 5. Re-label every breaker clearly and hand the building the permit closeout and new panel schedule.

What counts as done

  • Photo of the old panel nameplate before work
  • Signed permit / AHJ inspection record
  • Photo of the new panel with every breaker labeled
  • Circuit-by-circuit test log

Proof is measured against these, not judged by taste.

The money and the proof

What is promised, and what is not.

Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787200945686_kpsxs50","funderWallet":"0xYOU"}.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.