intermediate work · Reserva Natural Provincial Laguna de Rocha, Monte Grande, Partido de Esteban Echeverría, Provincia de Buenos Aires, AR
Mantenimiento del sendero público en Reserva Natural Provincial Laguna de Rocha, Partido de Esteban Echeverria (EN: maintain the public trail run).
Fund it for $480. Proof lands onchain when it's done.
$480 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesUn sendero con la superficie lavada, el desagüe tapado y el cartel caído deja de ser accesible y la gente lo esquiva pisando el pastizal. Reponer superficie, destapar el desagüe y enderezar la señal mantiene abierto el acceso público. EN: a trail with washed out surface, blocked drainage and a fallen sign stops being accessible and people walk around it through the grassland. Restoring surface, clearing drainage and righting the sign keeps public access open. Sitio: Reserva Natural Provincial Laguna de Rocha, Monte Grande, Partido de Esteban Echeverría, Provincia de Buenos Aires, AR.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Recorrer el tramo completo y anotar cada punto con superficie lavada, agua estancada o cartel caído. (EN: walk the whole run and note every washed surface, standing water and fallen sign.)
- Reponer y compactar el material de superficie en los puntos lavados. (EN: replace and tamp the surface material at the washed points.)
- Destapar las cunetas y los cruces de agua del sendero. (EN: clear the trail side drains and water crossings.)
- Enderezar y fijar los carteles y despejar la vegetación que invade la traza. (EN: right and fix the signs and clear vegetation from the tread.)
- Fotografiar cada punto antes y después y registrar el largo mantenido y el GPS. (EN: photograph each point before and after and record the length maintained and GPS.)
What counts as done
- Fotos antes de los puntos intervenidos (EN: before photos of the treated points)
- Fotos después de los mismos puntos (EN: after photos of the same points)
- Metros de sendero mantenidos y cantidad de carteles repuestos (EN: metres maintained and signs restored)
- Punto GPS del tramo (EN: GPS pin of the run)
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787203179341_7hmuodw","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.