intermediate work · Parque Kempes Ar Cba
Destapar las bocas de tormenta, el predio publico del Estadio Kempes (clear the storm drain inlets).
Fund it for $100. Proof lands onchain when it's done.
$100 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesLas bocas de tormenta del predio del Kempes se tapan con la hoja del otono y despues del evento quedan asi hasta la primavera. Las rejas de captacion estan tapadas de hojas, tierra y envases, y en la primera tormenta fuerte el agua se junta en la esquina en vez de entrar. EN: The Kempes grounds' storm inlets clog with autumn leaf fall and after an event stay that way until spring. The inlet grates are packed with leaves, soil and packaging, and in the first heavy storm the water ponds at the corner instead of entering.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Fotografiar cada reja tapada y numerarla antes de tocarla. EN: Photograph and number each blocked grate before touching it.
- Retirar con pinza y rastrillo el material acumulado sobre la reja y en los treinta centimetros de borde. EN: Rake and grab the material off the grate and from the thirty centimetres of surrounding gutter.
- Separar el material en residuo seco y organico y llevarlo al punto de disposicion acordado. EN: Separate the material into dry waste and organics and take it to the agreed disposal point.
- Verter un balde de agua sobre la reja limpia y confirmar que entra sin remanso. EN: Pour a bucket of water over the cleared grate and confirm it enters without ponding.
What counts as done
- Foto antes y despues de cada reja, numerada. EN: Before and after photo of each grate, numbered.
- Peso o volumen del material retirado y su destino. EN: Weight or volume of material removed and its destination.
- Prueba de entrada de agua en cada reja despejada. EN: Water-entry test at each cleared grate.
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787203882492_dd4i5ta","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.