intermediate work · Villa Allende Cerro Ar Cba
Construir escalones de contencion en el acceso, el sendero publico del Cerro de la Cruz de Villa Allende (build erosion-control steps.
Fund it for $440. Proof lands onchain when it's done.
$440 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesLa subida al Cerro de la Cruz se convirtio en una canaleta de tierra suelta por donde bajan todos. La bajada al agua es una canaleta de tierra suelta: cada persona que baja arrastra suelo y la proxima lluvia lo lleva al cauce. EN: The climb to the Cerro de la Cruz has become a loose-earth chute everyone comes down. The descent to the water is a loose-earth chute: every person going down drags soil with them, and the next rain carries it into the channel.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Marcar la linea de bajada mas usada y definir donde va cada escalon segun la pendiente. EN: Mark the most-used descent line and set where each step goes according to the slope.
- Anclar el travesano de madera o piedra local en un asiento cavado a mano, nivelado y calzado. EN: Anchor each timber or local-stone riser in a hand-dug seat, levelled and wedged.
- Rellenar detras de cada travesano con material del sitio y compactar hasta dejar la huella plana. EN: Backfill behind each riser with on-site material and tamp until the tread is flat.
- Cerrar con ramas y piedra las lineas de bajada alternativas para que el uso vuelva al escalonado. EN: Close the alternative descent lines with branches and stone so use returns to the steps.
- Fotografiar la bajada terminada y medir la altura de cada escalon. EN: Photograph the finished descent and measure the rise of each step.
What counts as done
- Foto antes de la bajada erosionada y foto despues desde el mismo punto. EN: Before photo of the eroded descent and after photo from the same vantage.
- Conteo de escalones y altura de cada uno. EN: Count of steps and the rise of each.
- Foto de los atajos cerrados. EN: Photo of the closed shortcuts.
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787203980156_dtszpol","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.