intermediate work · Agua de Oro Balneario Ar Cba
Construir escalones de contencion en el acceso, el balneario publico de Agua de Oro (build erosion-control steps.
Fund it for $440. Proof lands onchain when it's done.
$440 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesLa bajada al Chavascate en Agua de Oro no tiene un solo escalon y cada verano se lleva mas suelo. La bajada al agua es una canaleta de tierra suelta: cada persona que baja arrastra suelo y la proxima lluvia lo lleva al cauce. EN: The descent to the Chavascate at Agua de Oro has not one step and every summer takes more soil. The descent to the water is a loose-earth chute: every person going down drags soil with them, and the next rain carries it into the channel.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Marcar la linea de bajada mas usada y definir donde va cada escalon segun la pendiente. EN: Mark the most-used descent line and set where each step goes according to the slope.
- Anclar el travesano de madera o piedra local en un asiento cavado a mano, nivelado y calzado. EN: Anchor each timber or local-stone riser in a hand-dug seat, levelled and wedged.
- Rellenar detras de cada travesano con material del sitio y compactar hasta dejar la huella plana. EN: Backfill behind each riser with on-site material and tamp until the tread is flat.
- Cerrar con ramas y piedra las lineas de bajada alternativas para que el uso vuelva al escalonado. EN: Close the alternative descent lines with branches and stone so use returns to the steps.
- Fotografiar la bajada terminada y medir la altura de cada escalon. EN: Photograph the finished descent and measure the rise of each step.
What counts as done
- Foto antes de la bajada erosionada y foto despues desde el mismo punto. EN: Before photo of the eroded descent and after photo from the same vantage.
- Conteo de escalones y altura de cada uno. EN: Count of steps and the rise of each.
- Foto de los atajos cerrados. EN: Photo of the closed shortcuts.
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787204006203_630q2e9","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.