intermediate work · Carlos Paz la Quinta Ar Cba
Mantener un tramo del sendero publico, el Parque Estancia La Quinta (maintain a segment of the public trail).
Fund it for $240. Proof lands onchain when it's done.
$240 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesLos senderos de La Quinta se erosionaron donde el agua entra a la traza y no sale. El agua corre por la traza en vez de salir de ella, asi que la huella se ahonda, se angosta y la gente abre atajos al costado. EN: The La Quinta paths have eroded where water enters the tread and does not leave. Water runs down the tread instead of leaving it, so the path deepens, narrows, and people open shortcuts alongside it.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Recorrer el tramo y marcar con estacas cada punto donde el agua entra y no sale. EN: Walk the segment and stake every point where water enters the tread and does not leave.
- Abrir o limpiar los desagues laterales existentes para que el agua salga hacia la ladera baja. EN: Open or clear the existing side drains so water leaves toward the downhill side.
- Reponer material de la propia traza en las cunetas erosionadas y compactar a pisón manual. EN: Refill the eroded ruts with material from the trail itself and tamp it down by hand.
- Despejar la vegetacion que angosta el paso y cerrar los atajos con ramas y piedra local. EN: Cut back the vegetation narrowing the path and close the shortcuts with local branches and stone.
- Verter agua sobre el tramo terminado y fotografiar por donde sale. EN: Pour water over the finished segment and photograph where it leaves.
What counts as done
- Foto antes del tramo erosionado y foto despues desde el mismo punto. EN: Before photo of the eroded segment and after photo from the same vantage.
- Medicion del ancho de traza restituido. EN: Measurement of the restored tread width.
- Prueba de escurrimiento filmada o fotografiada en cada desague abierto. EN: Runoff test photographed or filmed at each opened drain.
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787204090850_jcelu32","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.