Reparar el borde roto de la acequia / Repair the broken acequia edge: Costanera del Canal Cacique Guaymallén.
Fund it for $260. Proof lands onchain when it's done.
$260 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesLos bordes de acequia se rompen con las raíces y el tránsito, y por ahí se fuga el agua antes de llegar a los árboles. Además el hueco es riesgo de tropiezo para quien camina. Reponer el borde con mortero es una reparación acotada y visible. Lugar: Costanera del Canal Cacique Guaymallén, Guaymallén, Provincia de Mendoza. Acequia edges break under roots and traffic; the water leaks away before it reaches the trees and the gap becomes a trip risk for anyone walking. Rebuilding the edge with mortar is a bounded, visible repair.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Marcar y fotografiar cada tramo de borde roto con una referencia de escala. / Mark and photograph each broken edge section with a scale reference.
- Sacar los trozos sueltos y limpiar la junta hasta encontrar material firme. / Take out the loose pieces and clean the joint back to sound material.
- Preparar mortero según la indicación del municipio y reponer el borde manteniendo la línea y el nivel originales. / Mix mortar to the municipal specification and rebuild the edge keeping the original line and level.
- Curar la reparación con agua durante los días indicados y señalizar el tramo mientras fragua. / Cure the repair with water for the specified days and sign the section while it sets.
- Fotografiar el borde terminado y verificar que el agua corre sin fugarse. / Photograph the finished edge and confirm the water runs without leaking.
What counts as done
- Fotos de cada tramo roto antes / Before photos of each broken section
- Metros lineales reparados / Linear metres repaired
- Fotos del borde terminado desde los mismos puntos / After photos from the same vantages
- Nota de curado y señalización durante el fragüe / Note of curing and signage while setting
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787205073859_yjtmxn2","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.