Anyone can start here · Barrio Alto Verde, canal del barrio (borde publico), Santa Fe, AR
Despejar el borde publico del canal de Alto Verde | Clear the public edge of the Alto Verde channel.
Fund it for $140. Proof lands onchain when it's done.
$140 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesAlto Verde vive entre el rio y la laguna, y el canal que ordena el agua del barrio se tapa con rama y voluminosos en su borde publico. Cada obstruccion se paga con agua adentro de las casas. | English: Alto Verde lives between the river and the lagoon, and the channel that orders the neighbourhood's water clogs with branches and bulky waste along its public edge. Every blockage is paid for with water inside the houses.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Recorrer el borde publico desde tierra firme y fotografiar cada obstruccion. | Walk the public edge from dry land and photograph each blockage.
- 2. Retirar a mano rama, bolsa y voluminosos del borde accesible. | Hand remove branches, bags and bulky waste from the accessible edge.
- 3. Separar por corriente y llevar a disposicion, sin empujar nada al cauce. | Separate by stream and take to disposal, never pushing anything into the channel.
- 4. Fotografiar el borde despejado y registrar cada punto con GPS. | Photograph the cleared edge and record each point with GPS.
What counts as done
- Foto de cada obstruccion antes de retirar | Photo of each blockage before removal
- Foto del borde despejado en cada punto | Photo of the cleared edge at each point
- Foto del material separado y llevado a disposicion | Photo of the separated material taken to disposal
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787206401818_1mw0lqc","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.