intermediate work · Parque Nacional Pre-Delta, acceso publico, Diamante, AR
Mantener despejada la linea cortafuego del acceso al Pre-Delta | Keep the firebreak line clear.
Fund it for $290. Proof lands onchain when it's done.
$290 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesEl Parque Nacional Pre-Delta protege el arranque del delta y sus pastizales secos arden con facilidad cuando baja el rio. La linea cortafuego del acceso publico es lo que separa un foco chico de una temporada perdida, y solo sirve si esta despejada antes de la temporada seca. | English: Parque Nacional Pre-Delta protects the head of the delta and its dry grasslands burn easily when the river drops. The firebreak line at the public access is what separates a small start from a lost season, and it only works if it is clear before the dry season.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Coordinar la jornada con la administracion del parque y con el cuerpo de bomberos de la jurisdiccion. | Coordinate the session with the park administration and the local fire service.
- 2. Recorrer la linea a pie y fotografiar cada tramo con vegetacion seca acumulada. | Walk the line on foot and photograph each stretch with built-up dry vegetation.
- 3. Cortar y retirar a mano la vegetacion acumulada, dejando el ancho que indique el parque. | Hand cut and remove the built-up vegetation, leaving the width the park specifies.
- 4. Apilar el material cortado fuera de la traza, donde indique la administracion. | Stack the cut material off the line, where the administration directs.
- 5. Medir el ancho despejado, fotografiar cada tramo y registrar GPS. | Measure the cleared width, photograph each stretch and record GPS.
What counts as done
- Foto de cada tramo con vegetacion acumulada antes del trabajo | Photo of each stretch with built-up vegetation before the work
- Foto de cada tramo despejado con el ancho medido | Photo of each cleared stretch with the width measured
- Foto del material cortado apilado fuera de la traza | Photo of the cut material stacked off the line
- Coordinacion con la administracion del parque y bomberos registrada por escrito | Coordination with the park administration and the fire service recorded in writing
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787206558109_pho6jjj","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.