intermediate work · Plaza 9 de Julio, Cachi, AR
Reasentar el empedrado publico del casco historico: Plaza 9 de Julio, Salta | Reset the public stone paving.
Fund it for $255. Proof lands onchain when it's done.
$255 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesEl empedrado publico de la quebrada recibe muchisimo mas paso del que fue pensado, y las piedras sueltas se convierten en tropiezos y en huecos que el agua agranda. Reasentarlas con material del lugar mantiene el piso y el caracter. Contexto: la plaza publica del pueblo calchaqui al pie del Nevado. Sitio: Plaza 9 de Julio, Cachi, Salta. | English: The quebrada's public stone paving takes far more foot traffic than it was built for, and loose stones become trip points and holes the water enlarges. Resetting them with matching local material keeps both the surface and the character. Context: the public plaza of the Calchaqui town at the foot of the Nevado. Site: Cachi, Salta province, Argentina.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Marcar y fotografiar cada piedra suelta, hundida o faltante del sector asignado. | Mark and photograph every loose, sunken or missing stone in the assigned sector.
- Levantar solo las piedras marcadas y nivelar la base con arena y material del lugar. | Lift only the marked stones and level the bed with sand and on-site material.
- Reasentar cada piedra a ras y golpear con maza de goma hasta que asiente. | Reset each stone flush and tap home with a rubber mallet.
- Rellenar las juntas con material identico al existente, sin cemento sobre lo historico. | Fill the joints with material matching the existing, never cement over historic fabric.
- Barrer el sector, contar piedras reasentadas y registrar punto GPS. | Sweep the sector, count stones reset and record a GPS pin.
What counts as done
- Foto del sector con las piedras sueltas | Before photo of the sector with the loose stones
- Foto del sector reasentado | After photo of the reset sector
- Conteo de piedras reasentadas y juntas rellenadas | Count of stones reset and joints filled
- Punto GPS del sector | GPS pin at the sector
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787207187557_nd5y5zx","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.