Anyone can start here · Plaza principal, Concepcion, AR
Destapar la cuneta publica y las bocas de alcantarilla: Plaza principal, Tucuman | Clear the public roadside ditch and culvert mouths.
Fund it for $145. Proof lands onchain when it's done.
$145 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesLa cuneta publica tapada manda el agua a las casas en vez de al arroyo. Destaparla antes de la temporada de lluvia es la obra hidraulica mas barata que existe. Contexto: la plaza publica de la segunda ciudad de Tucuman, sobre el corredor cañero sur. Sitio: Plaza principal, Concepcion, Tucuman. | English: A blocked public ditch sends water to the houses instead of the creek. Clearing it before the rainy season is the cheapest flood work there is. Context: the public plaza of Tucuman's second city, on the southern cane corridor. Site: Concepcion, Tucuman province, Argentina.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Recorrer el tramo de cuneta asignado y marcar los puntos tapados. | Walk the assigned ditch stretch and mark the blocked points.
- Sacar a pala el sedimento, las hojas y los residuos hasta recuperar la pendiente. | Hand shovel out sediment, leaves and litter until the fall is back.
- Despejar las bocas de alcantarilla en ambos extremos. | Clear the culvert mouths at both ends.
- Retirar el material a un lugar donde no vuelva a la cuneta. | Move the material somewhere it cannot wash back in.
- Registrar metros trabajados, bocas despejadas y puntos GPS. | Record metres worked, mouths cleared and GPS pins.
What counts as done
- Foto de la cuneta tapada antes | Before photo of the blocked ditch
- Foto de la cuneta despejada | After photo of the cleared ditch
- Metros trabajados y bocas de alcantarilla despejadas | Metres worked and culvert mouths cleared
- Puntos GPS de inicio y fin | GPS pins at the start and end
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787207422057_22n04mj","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.