intermediate work · paseo costero y playa pública de Playa Unión, Rawson, Rawson, Chubut, Argentina (EN: the Playa Union public beach and shore walk, Rawson, Rawson, Chubut, Argentina)
Reparar la superficie amortiguante de los juegos públicos: paseo costero y playa pública de Playa Unión, Rawson (EN: Repair the impact surface under the public playground.
Fund it for $240. Proof lands onchain when it's done.
$240 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesDebajo de las hamacas y el tobogán el material amortiguante se corre y queda el suelo duro justo donde más se cae. Reponerlo y nivelarlo devuelve la protección que el juego necesita para seguir abierto. Lugar: paseo costero y playa pública de Playa Unión, Rawson. EN: Under the swings and the slide the loose fill migrates and leaves hard ground exactly where the falls happen. Topping it up and levelling it gives back the protection the equipment needs to stay open. Site: the Playa Union public beach and shore walk, Rawson.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Fotografiar cada zona de caída con material corrido y medir la profundidad que queda. EN: Photograph each fall zone with migrated fill and measure the remaining depth.
- 2. Redistribuir el material existente con rastrillo hacia los puntos de mayor uso. EN: Rake the existing fill back toward the high-use points.
- 3. Reponer material nuevo hasta la profundidad indicada por el municipio y nivelar toda la zona de caída. EN: Top up with new fill to the depth the municipality specifies and level the whole fall zone.
- 4. Medir de nuevo la profundidad, fotografiar cada zona terminada desde el mismo punto y registrar volumen repuesto. EN: Re-measure the depth, photograph each finished zone from the matching vantage, and record the volume added.
What counts as done
- Foto y profundidad medida de cada zona de caída antes de empezar. EN: Before photo and measured depth of each fall zone
- Volumen de material repuesto, registrado. EN: Volume of fill added, recorded
- Profundidad medida después, contra la especificación municipal. EN: Depth measured after, against the municipal specification
- Foto de cada zona terminada desde el mismo punto. EN: After photo of each finished zone, matching vantage
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787208948181_neslvoq","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.