Anyone can start here · Dongguan Canal waterfront public path (public open space, exact site not yet named), Dongguan, CN
清通公共道路边沟与出水口:东莞运河滨水公共步道 | Clear the public roadside ditch and its outlet: Dongguan Canal waterfront public path.
Fund it for $80. Proof lands onchain when it's done.
$80 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involves边沟是把暴雨从路面带走的第一段路。一旦被落叶淤泥抬高,水就往路面和相邻场地漫。汛期前后清一遍,是最直接的防涝维护。 | The roadside ditch is the first stretch that takes a downpour off the surface. Once leaf litter and silt raise its bed, the water spreads onto the surface and the ground beside it instead. Clearing it before and after the wet season is the most direct flood maintenance there is. 地点:东莞运河滨水公共步道,东莞市,广东省。 | Site: Dongguan Canal waterfront public path, Dongguan, Guangdong, China.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 走完指定段,拍摄边沟与出水口现状并标出淤积段。 | Walk the assigned length, photograph the ditch and its outlet as found, and mark the silted sections.
- 手工清除淤积的落叶与泥沙,恢复沟底纵坡。 | Hand-clear the leaf litter and silt and restore the bed's fall.
- 清理出水口格栅,确认出水不受阻。 | Clear the outlet screen and confirm the discharge is not obstructed.
- 清出的材料按场地规定运至指定堆放点,不就地堆在沟边。 | Take the arisings to the named stockpile per the site's rules rather than leaving them on the ditch bank.
- 倒水测试并按相同机位拍摄完成照片。 | Run a water test and photograph from the matching vantage.
What counts as done
- 淤积段作业前照片 | Before photo of the silted section
- 同机位完成照片 | After photo from the same vantage
- 出水口过水测试照片 | Outlet water-test photo
- 清理长度(米)与起止 GPS 点 | Length cleared in metres plus start and end GPS pins
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787210046372_mh4fwy2","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.