Anyone can start here · 北湖生态公园(Beihu Ecological Park),成华区,成都市,四川省 / Chenghua District, Chengdu, Sichuan, CN
清通雨水花园进水口并复位消能石,北湖生态公园(成都) / Clear the rain-garden inlets and reset the splash stone, Beihu Ecological Park, Chengdu.
Fund it for $95. Proof lands onchain when it's done.
$95 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involves这是一处湖面与绿道相接、雨水设施沿路布置的生态公园。绿道旁的雨水花园进水口被泥沙与落叶垫高,消能石被冲散,雨水绕开花园直接流走,花园存在但不再收水;清通进水口、复位消能石,这套设施才重新起作用。 / An ecological park where the lake meets the greenway and stormwater features sit along the route. The rain-garden inlets beside the greenway are silted and leaf-packed and the splash stone has washed out of place, so runoff bypasses the garden entirely and the feature exists without catching water; clearing the inlet and resetting the stone puts it back in service.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. 拍摄进水口与花园现状,记录泥沙淤高与消能石缺失情况。 Photograph the inlets and garden as found and record the silt build-up and missing splash stone.
- 2. 用手工具清出进水口的泥沙与落叶,恢复设计进水标高。 Clear silt and leaves out of the inlet with hand tools back to the designed inlet level.
- 3. 把消能石复位铺回进水口下方,防止再次冲刷。 Reset the splash stone back under the inlet so the next inflow does not scour again.
- 4. 检查溢流口高度与蓄水深度标尺,清除挡住溢流的杂物。 Check the overflow height and ponding-depth marker and clear anything blocking the overflow.
- 5. 倒水或等一次降雨复看,确认水进得去、存得住、溢得出,并拍摄作业后照片。 Pour water or wait for one rain, confirm water enters, ponds and overflows as designed, and photograph the finished inlets.
What counts as done
- 作业前照片:淤高的进水口与冲散的消能石 / Before photo of the silted inlet and scattered splash stone
- 作业后照片:清通的进水口与复位的消能石 / After photo of the cleared inlet and reset stone
- 进水标高与蓄水深度量测记录 / Inlet-level and ponding-depth measurement log
- 过水测试视频:进水、蓄水、溢流 / Flow-test video showing inflow, ponding and overflow
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787211244614_pecataw","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.