intermediate work · 王官湿地公园(Wangguan Wetland Park),西山区,昆明市,云南省(滇池北岸)/ Xishan District, Kunming, Yunnan, CN (north shore of Dianchi)
维修湿地栈道晃动的护栏与立柱紧固件,王官湿地公园(昆明) / Repair the moving handrail and post fixings on the wetland boardwalk, Wangguan Wetland Park, Kunming.
Fund it for $190. Proof lands onchain when it's done.
$190 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involves这是滇池北岸湿地带的一段,架空栈道是主要通行路径。这段湿地栈道的护栏在手推下明显晃动、部分立柱底部紧固件锈蚀松脱,而护栏正是这段架空步道唯一的边界;复紧与更换紧固件,晃动才不会变成缺口。 / A stretch of the wetland belt on Dianchi's north shore where the raised boardwalk is the main route. The handrail on this stretch of wetland boardwalk moves noticeably under a hand push and some post-base fixings have corroded loose, and that rail is the only edge this raised walk has; re-fixing and replacing the fastenings stops movement turning into a gap.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. 沿栏杆逐跨施加水平手推,标记有明显位移的立柱与横杆并拍照。 Hand-push each rail bay horizontally, mark every post and rail that moves noticeably and photograph it.
- 2. 与养护班组取得同规格紧固件,更换锈蚀松脱件并复紧其余连接。 Get like-for-like fixings from the maintenance team, replace the corroded loose ones and re-tighten the rest.
- 3. 复核栏杆高度与栏杆间隙是否符合原设计,不改变栏杆形式。 Check the rail height and the gap between rails against the original design, without changing the rail form.
- 4. 对无法现场修复的立柱做明确标记并当日书面报给养护班组,不以警示带代替维修。 Mark any post that cannot be fixed on site and report it in writing to the maintenance team the same day, never leaving hazard tape as the repair.
- 5. 复做一次逐跨手推复核,拍摄作业后照片并记录处理数量。 Repeat the bay-by-bay hand-push check, photograph the finished rail and log how many fixings were handled.
What counts as done
- 作业前照片与手推复核记录:明显位移的跨 / Before photo and push-check record naming the bays that moved
- 作业后照片与复核记录:位移消除 / After photo and repeat push-check showing the movement gone
- 更换与复紧紧固件数量记录 / Log of fixings replaced and re-tightened
- 无法现场修复立柱的书面上报回执 / Written referral receipt for any post left for the maintenance team
Proof is measured against these, not judged by taste.
The standard this serves
Civic Safety Reporting. Civic safety is the craft of noticing for your neighbors: the burned-out light over a dark corner, the sidewalk lip waiting to trip someone, the overgrown hedge hiding a crosswalk. This standard is documentation and coordination only, no repairs: see the hazard clearly, grade how serious it is, record it with a photo and a place, and route it to the people with the authority to fix it. Mastery looks like a neighborhood where problems are found while they are still small. This packet is one clear-eyed report, and one clear report is how every fix begins.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787211642410_7sngqjn","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.