Anyone can start here · 盘龙江城区绿道(Panlong River urban greenway),盘龙区,昆明市,云南省 / Panlong District, Kunming, Yunnan, CN
在雨水口旁施划管理单位提供的地面提示标识,盘龙江城区绿道(昆明) / Apply the managing body's ground marking beside the stormwater inlets, Panlong River urban greenway, Kunming.
Fund it for $85. Proof lands onchain when it's done.
$85 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involves这是一条穿城而过的河道绿道,河岸缓冲带与雨水口沿线分布。这一线的雨水口旁没有任何提示,路过的人不知道这里倒下去的东西会直接进入下游水体;按管理单位提供的内容在雨水口旁施划标识,是最省钱的一次提醒。 / A river greenway running through the city with its bank buffer and its stormwater inlets strung along it. There is no marking beside the inlets along this stretch, so anyone passing has no way to know that what goes down here reaches the water body directly; applying the managing body's own wording beside each inlet is the cheapest reminder there is.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. 与管理单位取得标识内容、样式与许可点位,拍摄作业前状态。 Get the wording, the artwork and the permitted points from the managing body and photograph each spot as found.
- 2. 清扫并擦干施划位置的地面,确保附着。 Sweep and dry the marking position so the material bonds.
- 3. 按提供的样式逐个施划,使用管理单位指定的水性材料。 Apply the marking point by point to the supplied artwork using the water-based material the managing body specifies.
- 4. 养护至可通行前设置提示,不改动任何标识内容。 Keep a notice in place until the marking takes traffic, and change nothing about the wording.
- 5. 逐点拍摄作业后照片并记录施划数量与位置。 Photograph each finished marking and log the count and positions.
What counts as done
- 作业前照片:无标识的雨水口 / Before photo of the unmarked inlet
- 作业后照片:施划完成的标识 / After photo of the applied marking
- 施划数量、位置与材料记录 / Log of count, positions and material
- 标识内容与管理单位样式一致的确认 / Confirmation that the wording matches the supplied artwork
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787211733558_1f884su","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.