Anyone can start here · Jiyang Lake Ecological Park public grounds, Zhangjiagang, Suzhou, CN
补铺雨水花园的覆盖层,护住表土和渗透面:江苏省苏州市张家港市暨阳湖生态园 | Replenish the rain garden's mulch so the surface and its soil hold: Jiyang Lake Ecological Park, Zhangjiagang, Suzhou, Jiangsu.
Fund it for $150. Proof lands onchain when it's done.
$150 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involves覆盖层薄了以后,雨点直接砸在表土上,泥被打散、被冲走,渗透面很快板结。补一层树皮或碎木覆盖,既保水又保住这块地的渗透能力。现场:江苏省苏州市张家港市暨阳湖生态园。由采石与低洼地改造成的城市生态公园,靠近长江南岸。 | English: Once the mulch thins, raindrops hit bare soil, the surface disperses and washes out, and the infiltrating face crusts over fast. A fresh bark or wood-chip layer holds moisture and holds the cell's ability to take water. Site: Jiyang Lake Ecological Park, Zhangjiagang, Suzhou, Jiangsu. A city ecological park rebuilt from quarry and low ground, close to the Yangtze's south bank.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. 量出现有覆盖层厚度并拍照,标出低于三厘米的区域。 | Measure the existing mulch depth, photograph it, and mark every area under three centimetres.
- 2. 先把覆盖层里的塑料、烟头和其他垃圾捡出来带走。 | Pick out and carry away the plastic, cigarette ends and other litter sitting in the mulch.
- 3. 补铺树皮或碎木覆盖至五到七厘米厚,铺平不堆高。 | Lay bark or wood-chip mulch back to five to seven centimetres, spread level rather than heaped.
- 4. 把每株植物根颈周围五厘米让空,不要把覆盖物堆到茎干上。 | Leave five centimetres clear around each plant's root collar, never piling mulch against a stem.
- 5. 拍摄作业后照片,记录补铺面积与使用的覆盖物袋数。 | Photograph the finished bed and log the area replenished and the number of bags used.
What counts as done
- 覆盖层变薄处的作业前照片 | Before photo of the thinned mulch
- 同一位置补铺后的照片 | After photo of the same area replenished
- 补铺前后厚度(厘米) | Mulch depth before and after in centimetres
- 补铺面积与覆盖物袋数 | Area replenished and bags of mulch used
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787212443255_xdg09hn","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.