intermediate work · a retired cattle pasture edge along the Lavaca River greenway, Yoakum, TX 77995 (Lavaca County); best-estimate location near the town center, exact address not confirmed
Roll up and haul out an abandoned barbed-wire fence line, a retired cattle pasture edge along the Lavaca River greenway, Yoakum, TX 77995 (Lavaca County).
Fund it for $160. Proof lands onchain when it's done.
$160 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesA barbed-wire cross-fence along the greenway edge at Yoakum has stood unused since cattle were pulled off this ground -- the wire has come off several posts and lies loose in the grass, catching on deer, dogs, and anyone who steps off the mowed trail.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Walk the fence line end to end and confirm with the landowner or land manager which posts and wire are abandoned and cleared for removal before touching anything.
- 2. Wearing leather gloves, disconnect the loose wire from each post by hand, coiling it into manageable rolls as you go; where wire is still stapled, pull the staples with fencing pliers before rolling.
- 3. Working the line of posts, lever each t-post out by hand or with a post puller; a wooden post that will not lever free is cut flush at grade instead.
- 4. Load the rolled wire and pulled posts for haul-out and photograph the cleared line.
What counts as done
- Before photo of the down/loose wire along the line
- Landowner or land manager confirmation that the line is abandoned and cleared for removal
- Photo of each wire roll and pulled post staged for haul-out
- After photo of the cleared fence line
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787213120318_wuih2ku","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.