advanced work · a public park, Deer Park, TX 77536 (Harris County); best-estimate location near the town center, exact address not confirmed
Build a chimney swift tower.
Fund it for $1,200. Proof lands onchain when it's done.
$1,200 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesChimney swifts nested for thousands of years in hollow old-growth trees, then adapted almost entirely to open masonry chimneys once those trees largely disappeared; those chimneys are now increasingly capped or lined against them, and this park has no structure of any kind the birds could use. A standalone tower built to a published design gives the town a real, durable substitute.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. A qualified builder or trained park-department crew lays out the tower per a published chimney swift tower plan (about a 12 inch square interior, 12 to 24 feet tall), confirming the site is open public park ground clear of overhead lines and not shading any existing habitat feature.
- 2. Frame and finish the tower with a roughened interior surface (grooved or textured on the inside faces) so young birds can grip and climb, and set interior ledges spaced about 10 to 12 inches apart up the shaft.
- 3. Fit a removable, hinged cleanout panel at the base of the tower so every future maintenance visit works entirely from the ground, and finish the open entry slot at the top per the plan.
- 4. Photograph the finished tower from the park path, and record its height, base dimensions, and completion date.
What counts as done
- Confirmation that the tower was built by a qualified builder or trained park-department crew following a published chimney swift tower plan
- Before photo of the open park site with no tower present
- Finished tower height and base dimensions recorded
- Photo confirming the ground-level cleanout panel and the roughened, ledged interior finish
- After photo of the completed tower from the park path
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787213934112_elxatb5","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.