intermediate work · APN 0470242040000, Yucca Trail, Barstow, CA 92342 (Vealth-owned off-grid desert parcel, ~2 acres, Resource Conservation zoning), San Bernardino County
Build rock check-dams and rain basins to slow the parcel's runoff, Barstow.
Fund it for $95. Proof lands onchain when it's done.
$95 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesThe parcel's rare cloudbursts leave in minutes, cutting rills and taking soil with them; small rock check-dams and microcatchment basins turn those minutes of water into days of soak. In this climate the entire water budget is in the slowing.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Walk and photograph the rills and runoff lines, then flag check-dam and basin sites along the drainage pattern.
- Build one-rock-high check dams across the rills — a single course, keyed into the bed, never taller than one rock.
- Dig crescent microcatchment basins on contour above the planting spots and berm the downhill lip with the spoil.
- Photograph each structure from a matching vantage and log GPS per structure.
- After the next rain (or a poured-bucket test) photograph water held behind representative structures.
What counts as done
- Before photos of the rills and runoff lines
- After photos of each check dam and basin with a GPS log
- Water-holding photo after rain or a poured-bucket test
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1787677564534_58vl55g","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.