Anyone can start here · At home / national (any household, priority for pre-1986 plumbing or suspected lead service line)

Household lead-in-water screen, first-draw + flushed (certified lab) —.

Fund it for $140. Proof lands onchain when it's done.

$140 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.

What the work involves

Lead has no safe level and no taste, odor, or color — a home built before 1986 (when lead solder was banned) or served by a lead service line can be delivering it invisibly, and children and pregnant households carry the highest stakes. A paired first-draw/flushed certified-lab sample, read against EPA's action-level framing, is the only way to know — and it is the trigger for the utility's lead-service-line inquiry and a clinician conversation, never a home fix decided here.

Where
At home / national (any household, priority for pre-1986 plumbing or suspected lead service line) · Open the map
Pay
$140 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
A dated certified-laboratory first-draw and flushed lead result pair, collected per the lab's protocol with signed chain of custody, compared ONLY to EPA action-level framing, with the utility's lead-service-line status queried and every finding routed per the iron law

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-12-28
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

A documented method, so this packet comes out the same whoever does it.

Bring

  • The certified laboratory's lead sampling kit (separate bottles for first-draw and flushed samples)
  • A tap that has NOT been used for at least 6 hours before first-draw sampling (per standard protocol)
  • Chain-of-custody form
  • Household plumbing age/type records if known (year built, known pipe material, known lead service line status)

Steps

  1. 1. Confirm eligibility for urgent-priority screening: home built before 1986 (lead solder ban), a known or suspected lead service line, or a child under 6 / pregnant person in the household.
  2. 2. Contact the local water utility to ask directly whether a lead service line serves the property (many utilities maintain a public lead service line inventory/map under current EPA rule requirements).
  3. 3. Following the certified lab's kit instructions exactly, collect a FIRST-DRAW sample after the required non-use period (no flushing, first water out of the tap).
  4. 4. Following the same kit's instructions, collect a FULLY FLUSHED sample after running the tap for the lab-specified flush time.
  5. 5. Complete the chain-of-custody form noting the collection tap, non-use period, and any known plumbing/service-line facts.
  6. 6. Record the lab's reported first-draw and flushed lead results once received, in micrograms/L (ppb), with the lab's name and certification.
  7. 7. Compare both results only to EPA's action-level framing (currently 15 ppb at the system level; EPA is proposing 10 µg/L) — record the comparison, never a household 'safe' verdict, and route per the decision rules.

What counts as done

  • Certified laboratory named, with first-draw and flushed samples collected per its own kit instructions and a signed chain-of-custody form
  • Local water utility contacted (or contact attempt recorded) regarding lead service line status at the property
  • Both lead results reported in µg/L (ppb) with the lab's name/certification, compared explicitly to EPA's action-level framing; no household 'safe' verdict written
  • Pre-1986 plumbing status and any known service-line material recorded as context
  • Any elevated result, or any household with a child under 6 or a pregnant person, routed per the decision rules

Proof is measured against these, not judged by taste.

The money and the proof

What is promised, and what is not.

Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788116706532_ve8fgwj","funderWallet":"0xYOU"}.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.