intermediate work · Residential home, Charlottesville, VA
Stay in the house she raised the family in: aging-in-place retrofit plan, Charlottesville VA.
Fund it for $540. Proof lands onchain when it's done.
$540 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Open, but not claimable yet. restricted: regulated — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
What the work involvesA Charlottesville, VA widow in a two-story house with second-floor-only laundry and bath wants to stay, her family wants her safe. This packet is her claim of staying home safely: her actual daily routine walked and mapped, every fall hazard photographed, the home measured against accessibility references, and a three-tier plan from tonight's zero-construction fixes to a contractor-scoped first-floor-living option, with funding paths named.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- camera
- tape measure (doorway/hall widths, threshold heights, counter/bed/toilet heights, stair rise)
- lux meter or light-meter app (task + path lighting)
- tablet/clipboard with the STEADI-based room-by-room checklist
- notepad for the occupant's own routine map (their words)
Steps
- 1. Walk the occupant's actual day with them: wake, bathroom, kitchen, mail, laundry, favorite chair, bed. Record where they hesitate, grab, or avoid, the retrofit plan serves this routine, not a generic checklist. Their claim is simple: to stay in this home, safely.
- 2. Run the fall-hazard walkthrough (CDC STEADI home checklist): loose rugs and cords, stair condition + handrails both sides, tub/shower entry, toilet height, night path from bed to bathroom; photograph each hazard.
- 3. Measure the home against ICC/ANSI A117.1 references: doorway and hall clear widths, threshold heights, one-zero-step entry feasibility, bathroom clearances and reinforcement-ready walls for grab bars, kitchen reach zones; measure the light level on night paths and task areas.
- 4. Assess first-floor-living feasibility honestly: could a bedroom + full bath + laundry work on the entry level, and what would each move require (and which require a licensed contractor or structural review)?
- 5. Build the prioritized retrofit plan: immediate zero-construction wins (rug/cord/lighting/night-light changes), quick installs (grab bars into solid blocking, handrails, lever handles, threshold ramps), and contractor-scale items (bath reconfiguration, ramp with proper slope ~1:12, door widening), each cost-banded, with funding paths (OAA/USDA-504/state) the household may qualify for.
- 6. Review the plan with the occupant and any family/caregiver they choose; enter photos, GPS/address, measurements, the routine map, and the ranked plan; sign. Real (their day, measured), Proven (photo+GPS+signature), One-of-one (this person, this home). Route care/equipment questions to their clinician/OT and structural/electrical work to licensed contractors.
What counts as done
- Occupant's daily-routine map in their own words with hesitation/avoidance points
- Fall-hazard photo walkthrough (STEADI checklist) covering stairs, bath, night path
- Measurements vs ICC/ANSI A117.1: doorway/hall widths, thresholds, bathroom clearances, heights, night-path light levels
- GPS / address confirm
- Three-tier prioritized retrofit plan (zero-construction / quick-install / contractor-scale), cost-banded, funding paths + licensed-pro routing named
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788161345980_b7m72rm","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.