advanced work · Lodge/visitor-facility construction site, Springdale, UT
OSHA 1926 pre-task safety walk.
Fund it for $520. Proof lands onchain when it's done.
$520 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Open, but not claimable yet. restricted: regulated — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
What the work involvesA gateway-town construction/renovation site in Springdale, UT runs no documented daily pre-task safety walk; fall, scaffold, and temporary-electrical hazards go unrecorded between the crew's own checks.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- hard hat + safety glasses + hi-vis vest (site PPE)
- tablet/clipboard with the OSHA 1926 pre-task checklist
- camera
- GFCI outlet tester
- tape measure
- flashlight
Steps
- 1. Check in with the site's competent person; confirm scope, don required PPE, and confirm you observe-and-document only, no trade work, no entry into active hazard zones.
- 2. Walk the fall-exposure perimeter: photograph unprotected edges/openings 6 ft or greater, guardrail/cover condition, and any personal fall arrest anchorage in use (Subpart M).
- 3. Inspect scaffold and ladder condition: base/plumb/tie-in, planking, guardrails; ladder pitch (~4:1), footing, tie-off, and 3-ft landing extension (Subparts L/X).
- 4. Screen temporary electrical: cord condition, GFCI presence, panel access clearance; test accessible GFCI outlets with the tester and record trip/no-trip (Subpart K).
- 5. Record housekeeping and access/egress: trip/impalement hazards, material storage, walkways, and clear exit paths (Subpart C).
- 6. For each finding, mark condition against the OSHA 1926 checklist item, assign a tier (stop-work / correct-before-proceed / monitor), and name the responsible competent person.
- 7. Enter photos, GPS/address, checklist results, the GFCI test log, and the tiered findings list; sign. Route stop-work items to the competent person with a timestamp.
What counts as done
- Photos of fall-exposure, scaffold/ladder, temporary-electrical, and housekeeping conditions
- GPS / address confirm
- GFCI test log (outlet ID + trip/no-trip) for accessible temporary circuits
- Tiered findings list (stop-work / correct-before-proceed / monitor) with the responsible competent person named
- Timestamp of stop-work items routed to the site competent person
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788165255741_mkzns3w","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.