advanced work · the 4400 block of Crenshaw Blvd, Hyde Park, Los Angeles, CA 90043 (residential fourplex)
Add battery storage to the solar fourplex, 4400 block of Crenshaw Blvd.
Fund it for $800. Proof lands onchain when it's done.
$800 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesThis fourplex's solar exports at noon and imports at dusk; a listed battery keeps its clean generation for the evening peak and rides through outages, the storage half of the Energy Petal.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- UL 9540 listed battery system + mounting hardware per the approved plan
- NEC 706-rated disconnects, overcurrent protection, conduit and labeling
- torque tools + multimeter/clamp meter (licensed electrician)
- approved permit plan set incl. NFPA 855 siting/clearance sheet
Steps
- 1. ASSESS: verify the planned location meets NFPA 855 clearances (egress, separation, temperature range) and the wall/pad can carry the weight; photograph the location and the main panel before work.
- 2. Mount the battery and gateway/inverter per manufacturer torque and clearance specs; anchor seismic where required.
- 3. A licensed electrician runs conduit, lands conductors, installs disconnects/overcurrent protection, and applies NEC 706 labeling per the plan set.
- 4. Commission: energize per the manufacturer checklist, verify charge/discharge operation and backup transfer (if islanding), and register monitoring.
- 5. VERIFY: pass the AHJ inspection; photograph the installed system, clearances, and labels; record the commissioning report and leave the owner the operating guide.
What counts as done
- Location + clearance photos (NFPA 855) before and after
- UL 9540 listing nameplate photo
- Commissioning report (charge/discharge + backup transfer)
- AHJ inspection pass reference
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788171733482_z7mrsp1","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.