advanced work · the 4700 block of Crenshaw Blvd, Hyde Park, Los Angeles, CA 90043 (commercial strip building)
Install Level-2 EV charging behind the strip building, 4700 block of Crenshaw Blvd.
Fund it for $800. Proof lands onchain when it's done.
$800 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Open, but not claimable yet. restricted: permit-required, regulated — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
What the work involvesThis building's back-lot parking hosts cars all day with zero charging; every empty conduit run is a customer or employee who keeps a gas car.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- UL-listed Level-2 EVSE + mounting hardware
- conductors/conduit, breaker and GFCI protection per NEC 625 plan
- multimeter/clamp meter + torque screwdriver (licensed electrician)
- load calculation worksheet + permit
Steps
- 1. ASSESS: run/verify the service load calculation for the new circuit, confirm panel capacity and the run path, and photograph the panel schedule and install location before work.
- 2. Install the branch circuit (conduit, conductors, breaker) sized per the EVSE nameplate and NEC 625; torque terminations to spec.
- 3. Mount and wire the EVSE at the required height/location (clear of the parking envelope, cable management per listing) and label the circuit.
- 4. Commission: verify voltage, GFCI/CCID function, and a full charge session on a vehicle or tester; register the unit if networked.
- 5. VERIFY: pass the electrical inspection; photograph the completed installation, breaker, and label; record the charge-session proof and leave the owner the operating info.
What counts as done
- Load calculation + permit references
- Torque log + labeled breaker photo
- Electrical inspection pass reference
- Charge-session photo/log at the finished stall
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788171798589_krx0pgs","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.