advanced work · the 4700 block of Crenshaw Blvd, Hyde Park, Los Angeles, CA 90043 (commercial strip building)
Install solar on the flat commercial roof, 4700 block of Crenshaw Blvd.
Fund it for $880. Proof lands onchain when it's done.
$880 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesThis flat commercial roof is unshaded solar real estate producing nothing; ballasted PV here is the Energy Petal at commercial scale.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- fall protection (anchored harness) + hard hat + gloves (site PPE)
- PV modules, racking/flashing, inverter(s), conduit and NEC 690-rated disconnects per the approved plan set
- torque wrench + multimeter/clamp meter + irradiance or production-check tool
- approved permit plan set + utility interconnection application
Steps
- 1. ASSESS: verify the approved permit plan set matches the roof (structure, rafter condition, shading, array layout); confirm the main panel rating and the planned interconnection method; photograph existing roof + panel before work.
- 2. Install flashed roof attachments and racking to the structural plan (torque to spec, flash every penetration watertight); document torque checks.
- 3. Mount modules, run conduit/wiring, and land the inverter(s) and NEC 690 disconnects and labels exactly per the plan set; a licensed electrician makes and inspects the electrical terminations.
- 4. Commission: energize per the inverter checklist, measure open-circuit/operating values against design, and record initial production.
- 5. VERIFY: pass the AHJ final inspection and submit utility permission-to-operate; photograph the completed array, labels, and production reading; leave the owner the as-built + warranty packet.
What counts as done
- Before photos of roof + electrical room
- Layout-conformance and membrane-protection photos
- AHJ inspection pass + permission-to-operate reference
- Commissioned production reading photo
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788171811608_18y31eq","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.