advanced work · the 13800 block of Van Nuys Blvd, Pacoima, Los Angeles, CA 91331 (commercial strip building)
Install solar on the flat commercial roof, 13800 block of Van Nuys Blvd.
Fund it for $880. Proof lands onchain when it's done.
$880 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Open, but not claimable yet. restricted: permit-required, regulated — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
What the work involvesThis flat commercial roof is unshaded solar real estate producing nothing; ballasted PV here is the Energy Petal at commercial scale.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- fall protection (anchored harness) + hard hat + gloves (site PPE)
- PV modules, racking/flashing, inverter(s), conduit and NEC 690-rated disconnects per the approved plan set
- torque wrench + multimeter/clamp meter + irradiance or production-check tool
- approved permit plan set + utility interconnection application
Steps
- 1. ASSESS: verify the approved permit plan set matches the roof (structure, rafter condition, shading, array layout); confirm the main panel rating and the planned interconnection method; photograph existing roof + panel before work.
- 2. Install flashed roof attachments and racking to the structural plan (torque to spec, flash every penetration watertight); document torque checks.
- 3. Mount modules, run conduit/wiring, and land the inverter(s) and NEC 690 disconnects and labels exactly per the plan set; a licensed electrician makes and inspects the electrical terminations.
- 4. Commission: energize per the inverter checklist, measure open-circuit/operating values against design, and record initial production.
- 5. VERIFY: pass the AHJ final inspection and submit utility permission-to-operate; photograph the completed array, labels, and production reading; leave the owner the as-built + warranty packet.
What counts as done
- Before photos of roof + electrical room
- Layout-conformance and membrane-protection photos
- AHJ inspection pass + permission-to-operate reference
- Commissioned production reading photo
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788172228252_xlh8hvp","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.