Anyone can start here · Stpiusv

Clear and repair the gutters and downspouts.

Fund it for $260. Proof lands onchain when it's done.

$260 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.

What the work involves

The gutters and downspouts at a community building in Chicago, IL are clogged and separated, dumping roof runoff down the walls instead of away. Clearing and repairing them protects the building.

Where
Stpiusv · Chicago, IL (community building, exact site not yet named) · Open the map
Pay
$260 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
before/after photos of each gutter run + downspout outlet + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-09-30
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

A documented method, so this packet comes out the same whoever does it.

Bring

  • camera
  • gutter scoop or hose wand, bucket and tarp
  • ladder or elevated platform appropriate to the height, plus the fall protection the building's rules require and a spotter
  • caulk gun with exterior-rated sealant and patching compound
  • rake, tarp and waste bags
  • tape measure and a 4-ft level for grading
  • gloves and safety glasses

Steps

  1. 1. Confirm the scope and the access rules with the facility manager BEFORE starting: where ladders may be set, whether the work is above an entrance or a walkway that must be closed off, whether a permit or a contractor induction is required, and who to call if something is found. An institutional building has rules about working at height that a house does not, and they are not waivable on site.
  2. 2. Photograph the gutter run, downspouts, perimeter debris and any envelope gap or grading problem as found, from the vantage points that will be used again afterwards.
  3. 3. Confirm the building's condition constraints: post-1978, or pre-1978 with intact, unpainted-substrate work only. Any disturbed pre-1978 paint STOPS this scope and routes to an EPA-certified firm, and in a building children use that determination is made before a tool is picked up.
  4. 4. Cone off or otherwise protect the work zone below, then clear debris from the gutters and confirm the downspouts drain freely and discharge clear of the foundation and away from any walkway or entrance where discharge would create a slip hazard. Re-secure loose hangers within reach.
  5. 5. Clear accumulated debris from the building perimeter, entrances and walkways so drainage paths and pest-entry points stay clear, and bag or stage waste for the building's own collection arrangement rather than leaving it at the kerb.
  6. 6. Patch and seal small envelope gaps at trim, soffit and utility penetrations with exterior-rated sealant, and regrade a short run of soil away from the foundation where it currently slopes toward it.
  7. 7. Verify: gutters run clear water end to end, downspouts discharge away from the foundation and away from walking surfaces, patched gaps are weathertight, and the perimeter is clear. Photograph the finished work from the same vantages as the before photos, and reopen any area that was closed off.
  8. 8. Enter before and after photos, materials used, and every hazard found (active leak, structural rot, suspected lead paint, an unsafe roof edge) into the proof record and report them to the facility manager; sign.

What counts as done

  • Before photo of the clogged/overflowing gutter run
  • After photo of the cleared gutter with clean water flow demonstrated
  • Note of any loose hangers or seam leaks found and resealed
  • GPS / address confirm

Proof is measured against these, not judged by taste.

The money and the proof

What is promised, and what is not.

Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788175574339_z6me9pv","funderWallet":"0xYOU"}.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.