intermediate work · 2800 block of E Street, Kensington, Philadelphia, PA 19134
Rebuild a broken stoop step.
Fund it for $540. Proof lands onchain when it's done.
$540 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Open, but not claimable yet. restricted: regulated — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
What the work involvesOne or more stoop steps at 2800 block of E Street, Kensington, Philadelphia, PA 19134 has spalled past a simple patch (broken tread, uneven rise) turning a daily entryway into a fall risk for residents and mail carriers alike.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- demolition hammer or chisel + hand tools (removing failed material)
- form lumber or edging + level
- concrete mix or masonry repair mortar + trowel + float
- tape measure + level + camera
Steps
- 1. ASSESS: measure the failed step's rise/run against the adjacent steps and the sidewalk grade; photograph the failure; confirm no utility lines run through the work area.
- 2. Remove the broken/spalled material down to sound substrate; form the new step edge to match the original rise/run.
- 3. Place and finish the new concrete/mortar to a level, non-slip surface, matching the adjacent step heights within a safe tolerance.
- 4. Cure per spec (barricade the stoop from use during cure) and verify the finished step's rise/run and level with a level and tape measure.
- 5. Photograph the finished, cured step from the same before vantage and remove the barricade only once fully cured.
What counts as done
- Before photo + rise/run measurement of the failed step
- After photo + rise/run measurement matching the adjacent steps
- Level-check photo confirming a non-slip, level finished surface
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788176811585_2ygybpz","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.