intermediate work · Sa Elpaso
Patch a pothole.
Fund it for $240. Proof lands onchain when it's done.
$240 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesA fist-sized pothole in the alley behind this block has widened all summer, catching bicycle tires and pooling water after every storm.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- right-of-way permit + cones, barricades and signage for a compliant work zone
- cold-patch asphalt or the specified repair mortar, plus bonding agent
- grinder or saw with a water feed or vacuum shroud (respirable silica control)
- tamper or plate compactor, trowels, screed
- smart level or 2-ft level + straightedge + tape measure
- respirator, eye and hearing protection, gloves
- camera + GPS phone
Steps
- 1. ASSESS: photograph the defect as found and measure it (vertical discontinuity, ponding depth, spall area, cross slope); record the numbers before touching anything.
- 2. Set the work zone: cones, barricades and a maintained pedestrian detour; confirm the right-of-way permit and, for anything cut into the ground, the honored 811 locate.
- 3. Square up and clean the repair area, removing loose and unsound material back to a sound edge; run every cut or grind wet or under vacuum, never dry.
- 4. Place the repair material in the specified lifts, compacting or consolidating each lift, and finish to match the surrounding grade and the drainage direction.
- 5. VERIFY: straightedge and level the finished patch, confirming vertical discontinuity at or under 1/4 in and cross slope at or under 2 percent; record both readings.
- 6. Photograph the finished repair from the before vantage, log the permit reference and the cure or reopen time, and enter them in the proof record.
What counts as done
- Before photo of the pothole with a measured depth/width
- After photo of the filled, tamped, flush patch
- Cold-patch material note + quantity used
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788177501631_fxqv4um","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.