advanced work · the 400 block of E Ninth Street, Tenth Street Historic District, Oak Cliff, Dallas, TX 75203

Install rooftop solar on a low-rise home on the 400 block of E Ninth Street, Tenth Street Historic District, Oak Cliff, Dallas, TX 75203.

Fund it for $880. Proof lands onchain when it's done.

$880 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Open, but not claimable yet. restricted: permit-required, regulated — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.

What the work involves

Pitched roofs on this block sit in full Dallas sun producing nothing; rooftop PV is the primary Energy-petal instrument here, and Texas's ERCOT summer peak makes every panel count double.

Where
the 400 block of E Ninth Street, Tenth Street Historic District, Oak Cliff, Dallas, TX 75203 · Open the map
Pay
$880 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
permit + torque/flash log + inspection pass + production reading photo + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-09-30
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

A documented method, so this packet comes out the same whoever does it.

Bring

  • fall protection (anchored harness) + hard hat + gloves (site PPE)
  • PV modules, racking/flashing, inverter(s), conduit and NEC 690-rated disconnects per the approved plan set
  • torque wrench + multimeter/clamp meter + irradiance or production-check tool
  • approved permit plan set + utility interconnection application

Steps

  1. 1. ASSESS: verify the approved permit plan set matches the roof (structure, rafter condition, shading, array layout); confirm the main panel rating and the planned interconnection method; photograph existing roof + panel before work.
  2. 2. Install flashed roof attachments and racking to the structural plan (torque to spec, flash every penetration watertight); document torque checks.
  3. 3. Mount modules, run conduit/wiring, and land the inverter(s) and NEC 690 disconnects and labels exactly per the plan set; a licensed electrician makes and inspects the electrical terminations.
  4. 4. Commission: energize per the inverter checklist, measure open-circuit/operating values against design, and record initial production.
  5. 5. VERIFY: pass the AHJ final inspection and submit utility permission-to-operate; photograph the completed array, labels, and production reading; leave the owner the as-built + warranty packet.

What counts as done

  • Before photos of roof and main panel
  • Attachment torque + flashing log with photos
  • AHJ inspection pass + permission-to-operate submission reference

Proof is measured against these, not judged by taste.

The money and the proof

What is promised, and what is not.

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788177892374_5p8m829","funderWallet":"0xYOU"}.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.