Anyone can start here · 1300 block of V Street SE, Anacostia, Washington, DC 20020
Clear and extend the ground-level downspout.
Fund it for $180. Proof lands onchain when it's done.
$180 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
What the work involvesRowhouses on the 1300 block of V Street SE, Anacostia, Washington, DC 20020 shed roof runoff straight against the foundation and party wall through short, clogged downspouts, a ground-level clear-and-extend keeps that water off the footing without ever touching a ladder.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- gloves + trash bag (debris)
- downspout extension or splash block
- garden hose (flow test)
- camera
Steps
- 1. ASSESS: photograph the downspout outlet and the ground/foundation area it drains to; check whether water is pooling against the foundation or a neighbor's party wall.
- 2. Clear any reachable debris from the downspout outlet and the ground-level elbow by hand, from ground level only, no ladder, no roof access.
- 3. Fit and secure a downspout extension or splash block so discharge routes at least several feet from the foundation, away from the party wall and any basement entry.
- 4. Flow-test with a garden hose at the gutter's ground-level outlet and photograph the water routing away from the foundation.
What counts as done
- Before photo of the downspout outlet and where it drains
- After photo of the fitted extension/splash block
- Flow-test video/photo showing water routed away from the foundation
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788180626671_qiu44r1","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.