advanced work · 1200 block of U Street SE, Anacostia, Washington, DC 20020
Repair the roofline gutter run.
Fund it for $740. Proof lands onchain when it's done.
$740 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
What the work involvesThe ground-level clear at this rowhouse on the 1200 block of U Street SE, Anacostia, Washington, DC 20020 found the trouble is up in the roofline trough itself, sagging seams and standing water at the roof edge, the credentialed elevated-work job the ground rung routes to.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- anchored fall-arrest harness + ladder rated for the height (site PPE)
- gutter scoop/trowel + bucket
- gutter sealant or replacement hanger/section as needed
- camera
Steps
- 1. ASSESS: set up and inspect the ladder/anchor point per OSHA 1926 Subpart M before any climb; photograph the gutter's condition (sag, disconnected hangers, leaks) from the ground first.
- 2. With fall protection anchored, clear debris from the gutter trough and downspout head; check hanger spacing and pitch toward the downspout.
- 3. Reseal joints, replace failed hangers/sections, and re-pitch the run so it drains fully to the downspout.
- 4. Flow-test with water from the roof edge and confirm no leaks at seams/joints; photograph the completed run.
- 5. Descend, stow equipment, and photograph the finished gutter from the ground vantage matching the before photo.
What counts as done
- Photo of the anchored fall-protection setup before climbing
- Before/after photos of the gutter run from the ground vantage
- Flow-test photo/video showing no leaks at seams or joints
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788180730818_unj2nis","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.