Anyone can start here · 1200 block of U Street SE, Anacostia, Washington, DC 20020
Patch the cracked front-stoop step.
Fund it for $180. Proof lands onchain when it's done.
$180 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
What the work involvesRowhouses on the 1200 block of U Street SE, Anacostia, Washington, DC 20020 carry decades-old concrete stoop steps; hairline cracks widen every freeze-thaw winter into trip hazards and let water into the step's base. A quick hydraulic-cement patch stops both before either gets worse.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- wire brush + shop vac (debris clearing)
- hydraulic cement or concrete patch compound
- trowel + mixing bucket + water
- camera + tape measure
Steps
- 1. ASSESS: photograph and measure each crack/spall on the stoop tread and risers; confirm the crack is a surface/shallow patch candidate (hairline to ~1/2 inch, not a structural step separation) and that the stoop is stable to stand on.
- 2. Clear loose debris, dirt and old crumbling material from the crack with a wire brush and shop vac; dampen per the patch product's instructions.
- 3. Mix and apply the hydraulic cement or concrete patch compound, packing the crack fully and troweling it flush with the surrounding surface.
- 4. Cure per the product's instructions (keep foot traffic and water off during cure) and photograph the finished patch from the same before vantage.
What counts as done
- Photo of each crack/spall before patching
- Photo of the same spot after patching (matching vantage)
- Materials note (hydraulic cement/patch compound used) + cure-time confirmation
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788180743828_029ulz6","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.