advanced work · 4200 block of N Watkins St, Frayser, Memphis, TN 38127 (residential)
Stabilize deteriorated exterior paint on a pre-1978 home on the 4200 block of N Watkins St, Frayser.
Fund it for $720. Proof lands onchain when it's done.
$720 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Open, but not claimable yet. restricted: regulated — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
What the work involvesPeeling exterior paint on this block's older housing predates 1978 lead-paint rules; EPA RRP-certified stabilization contains and removes the hazard the safe way.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- EPA Lead-Safe Certified firm credentials + RRP-compliant containment sheeting
- wet-sanding/wet-scraping tools (no dry sanding/scraping, no open-flame burning)
- HEPA vacuum + HEPA-filtered respirator/PPE per the RRP work-practice standards
- post-work clearance dust-wipe test kit
Steps
- 1. ASSESS: confirm the certified-firm/renovator credential and the pre-work lead-hazard-document-survey findings (which surfaces, which planned disturbance); set up RRP-compliant containment (plastic sheeting, warning signs, occupant/child exclusion from the work area) before any disturbance.
- 2. Stabilize the deteriorated paint using RRP-compliant wet methods only (wet scraping/wet sanding, or a HEPA-shrouded tool), never dry sanding, dry scraping or open-flame burning.
- 3. Prime and finish-coat the stabilized surface with the agreed paint/finish; keep containment in place until cleanup is complete.
- 4. Perform RRP cleanup: HEPA-vacuum all surfaces and the containment area, wet-wipe, and verify with the post-work cleaning verification / clearance dust-wipe method.
- 5. Remove containment only after clearance passes; photograph the finished surface and file the RRP compliance record (firm certification, work practices used, cleanup verification) with the household.
What counts as done
- Before photo of the deteriorated painted surface
- Containment setup photo (plastic sheeting, wet methods)
- Clearance verification result + after photo
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788181668366_9vowjrz","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.