advanced work · Broad Ave, Binghampton, Memphis, TN 38112 (public right-of-way)
Repair a broken sidewalk panel with a permeable finish on Broad Avenue, Binghampton.
Fund it for $720. Proof lands onchain when it's done.
$720 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesRoot-heaved, cracked sidewalk panels on Broad Avenue trip the district's foot traffic daily and shed every drop of rain to the gutter; a permeable repair fixes the fall hazard and adds infiltration.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- right-of-way permit + traffic cones/barricades and signage
- wet-cut saw or grinder with water feed + vacuum (dust control), or paver lift/reset tools
- permeable paving material (permeable pavers/pervious mix) + bedding aggregate + compactor
- 2-ft level / smart level + measuring wheel + camera
Steps
- 1. ASSESS: measure and photograph each displaced/cracked panel (lift height, cross-slope, ponding), mark the repair extent, and confirm the right-of-way permit and utility locates (811) before any cutting.
- 2. Set up cones/barricades and a safe pedestrian detour; keep all work out of the traffic lane.
- 3. Remove or wet-cut the failed section with water-fed dust controls; excavate to the design subbase and correct the root or subgrade cause (root-prune only per the city arborist standard).
- 4. Place open-graded base and the permeable surface (pavers or pervious mix) to ADA/PROWAG slope and lippage limits; compact and edge.
- 5. VERIFY: check cross-slope ≤2% and vertical discontinuity ≤1/4 inch, water-test infiltration, photograph before/after from the same vantage, and close out the permit.
What counts as done
- Before photos with measured lift/slope readings
- Permit + 811 locate references
- After photos with level readings
- Water-test photo/video showing infiltration
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788181928813_e9xncy4","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.